Newman Library Closed at Times during Spring Break

The Newman Library will be closed for periods of time during spring break to allow for repairs due to damage from last year’s water main break.  The schedule below is based on estimates from the contractors.  We may have to make adjustments if the work schedule requires.  Please check the #Alert message at the top of the Library’s home page or the Twitter feed from CIOBARUCH for the latest status.

Monday 4/14: CLOSED

Tuesday 4/15: Open from 9:00 AM to 6:00 PM ONLY

Wednesday 4/16: Open ONLY from 4:00 PM to 12:00 AM

Thursday 4/17: Open normal hours (7:00 AM to 12:00 AM)

Friday 4/18: Open normal hours (7:00 AM to 12:00 AM)

Please note that currently enrolled Baruch College students have access to the other CUNY libraries.

Library Building Must Close Early on Thursdays in March Due to Electrical Work

The Information and Technology Building (151 East 25th Street) is scheduled to be closed from 9:00 p.m. to 9:00 a.m. on four consecutive Thursdays: March 06; 13; 20 and 27. This is due to electrical repair work to be done as a result of the east 26th Street water main break in March 2013. The repairs will require a complete power shut down, which will affect all building systems.  On those Thursdays, to prepare for the loss of power, computer systems, wifi service, and Internet access will start to shut down at 6:00 p.m.  The reference desk will remain open until 9:00.  However, the circulation and laptop loan desks will close at 6:00 along with the student computing lab on the 6th floor.  Currently enrolled Baruch students may use labs on the 6th floor of the Newman Vertical Campus across the street.  We regret the inconvenience caused by these necessary repairs.